By 2024, Sound Transit intends to offer high-capacity bus service to communities along Lake Washington. Image courtesy Sound Transit

By 2024, Sound Transit intends to offer high-capacity bus service to communities along Lake Washington. Image courtesy Sound Transit

Sound Transit Plans High-Capacity Buses for the Eastside

Faster bus lines along I-405 and SR-522 are in the works.

By 2024, Sound Transit says it will have fast bus service running along both I-405 and SR-522, servicing communities on the north, south, and east sides of Lake Washington.

Officially dubbed Bus Rapid Transit (BRT), the plans calls for high-capacity buses that with off-board payment, allowing riders to enter or exit through multiple doors, similar to King County Metro’s RapidRide system.

The proposed line along I-405 will run 37 miles from Lynnwood to Burien, stopping at 11 existing bus stations and a proposed new transit center in South Renton. The line will also intersect with yet-to-be-built Link Light Rail stations in Lynnwood, Bellevue, and the existing Tukwila station. Sound Transit projects that riders will be able to reach Bellevue from Lynnwood in 45 minutes, and Burien from Bellevue in 48.

Similarly, the SR-522 BRT route will run eight miles between Shoreline and Woodinville, servicing nine stations and connecting to the planned light rail station in Shoreline at NE 145th St. With this new route, Sound Transit estimates that riders will be able to get from Lake Forest Park to downtown Seattle in 38 minutes.

“The speed, frequency, and reliability of BRT service will mean major improvements in riders’ commutes,” Sound Transit CEO Peter Rogoff wrote in a statement.

Building a Sound Transit BRT network is part of the $54 billion Sound Transit 3 transportation funding package, which voters passed back in 2016. The Eastside BRT projects are financed by ST3-driven increases in regional funding sources (property taxes, sales taxes and car tab fees) within the Sound Transit taxing district. Sound Transit does not anticipate seeking federal grants for the expansion.

Sound Transit aims to spend the rest of 2018 soliciting public input and drafting route plans for the Eastside BRT expansion, after which the Sound Transit Board will authorize draft engineering plans and run them through the environmental review process in 2019. Assuming everything goes according to plan, proposed route alignments will be selected in 2020, design and engineering elements finalized by 2022, and construction finished by 2024.

Simultaneously, the Washington state Department of Transportation is working on building out express toll lanes for high-capacity vehicles along I-405 from Bellevue to Renton. Construction is slated to finish in 2024, just in time for Sound Transit’s rollout of BRT along the same route. The BRT buses will be able to utilize the new lanes.

A public meeting on the SR-522 route is expected to occur the last week of May, while a similar event on the I-405 route is slated for June. Details on both have yet to be determined, per a Sound Transit spokesperson.

jkelety@seattleweekly.com

More in News & Comment

Upon further review, EPA wants to redo water quality rules

Feds say they’ll use what the state submitted in 2016 even though they’re no longer the state’s faves.

King County Councilman Reagan Dunn sent a letter to the FBI asking for them to help investigate Allan Thomas (pictured), who is under investigation for stealing more than $400,000 of public funds and skirting election laws in an Enumclaw drainage district. Screenshot from King 5 report
King County Council requests report on special districts in wake of fraud allegations

Small, local special districts will face more scrutiny following Enumclaw drainage district case.

The Marquee on Meeker Apartments, 2030 W. Meeker St. in Kent, will feature 492 apartments and 12,000 square feet of retail. The first phase of 288 apartments is expected to be completed in early 2020. Developers are targeting people in their 20s and 30s to rent their high-end, urban-style apartments. Steve Hunter/staff photo
Housing study pokes holes in conventional wisdom

High construction and land costs will incentivize developers to build luxury units.

File photo
Eviction reform passed by state Legislature

Tenant protections included longer notices and more judicial discretion.

Oh, crab! There’s something fishy about this place

That mysterious eyesore by the sea will be replaced by a new research center. “It’s all going to go.”

With ‘Game of Thrones’ ending, it’s time for a proper feast

How to make a meal inspired by the Lannisters’ and Starks’ world, fit for the King in the North.

Edmonds looks to transform a prime piece of waterfront

After the Senior Center breaks ground on a new building, the city could complete a beach walkway.

A Metro bus coming out of the Bellevue Transit Center. File photo
I-90 bus routes could be eliminated in 2023

King County Metro and Sound Transit are considering service changes with the arrival of light rail.

In state House, one historic era ends and another begins

Chopp is out as speaker. Lovick is in, and already dealing with next steps in two investigations.

Most Read